TI-39-Int: Production Planning and Control Major Assignment
- Visit a manufacture company (different company or division for each group) and find out its production problem in: a. Material Planning (MRP), or, b. Machine Scheduling (Flow Shop or Job Shop), or, c. Assembly Line Balancing (each topic is taken by at least three group)
- Collect the input data needed from the company, you may use some assumption (minor) to support the calculation
- Solve the problem using the method that appropriate for the case
- Write a report that consists of: 1. The company and its production characteristics, 2. Data, 3. Data Processing 4. Result and Analysis
- You may add photos, videos, and animation in your report
- Format of the report is free, you can create is as good and creative as possible
- Report should be submitted before 2 May 2017